~bzr-pqm/bzr/bzr.dev

« back to all changes in this revision

Viewing changes to doc/en/admin-guide/integration.txt

Put in place a structure for the admin-guide

Show diffs side-by-side

added added

removed removed

Lines of Context:
 
1
Integration with Other Tools
 
2
============================
 
3
 
 
4
Patch Queue Manager (PQM)
 
5
-------------------------
 
6
 
 
7
Bug Trackers
 
8
------------
 
9
 
 
10
Continuous Integration Tools
 
11
----------------------------
 
12
 
 
13
Bundle Buggy
 
14
------------